Cost Engineer di provinsi Lampung
1-7 dari 7 pekerjaan
- Cost Engineer
- Maintenance Engineer 10
- Operator Produksi 21
- Staff Gudang 8
- Staff Mesin 7
- Supervisor Gudang 9
- Supervisor Produksi 14
- Support Engineer 6
- Teknik Project 7
- Teknik Umum 6
- Teknisi 9
- Metro 6
- Lampung Selatan 1
- Lampung 7
- Pekarja lepas
- Sarjana
- Sementara
- Sukarela
- Tetap
- Paruh Waktu
- Purna Waktu 1
- Kemarin 0
- Minggu ini 2
-
Workshop Supervisor
Metro, Lampung
...As a Supervisor with AES, you are responsible for supervising and leading a team of multi-skilled equipment maintenance personnel in a safe and cost-effective...
4 hari yang lalu dalam JobleadsLaporkan -
Manufacturing Engineer / Maintenance Supervisor
Metro, Lampung
MANUFACTURING ENGINEER / MAINTENANCE SUPERVISOR September 11, 2024 Position Summary: In addition to supervising the Maintenance team, this role will be...
30+ hari yang lalu dalam JobleadsLaporkan -
Area Planning Engineer - Metro West Atlanta
Metro, Lampung
...team environment for project success Attention to detail and following processes and procedures JOB RESPONSIBILITIES Develop innovative and cost-effective
8 hari yang lalu dalam JobleadsLaporkan -
Senior Mechanical Engineering -Building
Metro, Lampung
...cost estimates. Prepare or provide input to 3D models and 2D mechanical drawings. Participate in and contribute to design reviews. Assist in the compilation...
30+ hari yang lalu dalam JobleadsLaporkan -
Engineer
Indo Thai Coco Investama Lampung Selatan, Lampung
...coconut processing lines (including products such as coconut milk, activated carbon, desiccated coconut, and more). Conduct feasibility studies, assist in cost...
5 hari yang lalu dalam PintarnyaLaporkan -
Depot & Buildings Structural Expert - Metro
Metro, Lampung
...Key figures: First stage Operational in 2034. Estimated 2 million passengers per day will benefit from the new metro network. 50bn estimated cost...
30+ hari yang lalu dalam JobleadsLaporkan -
Engineering Director (Civils/Structural/Tunnel/Digital) Metr
Metro, Lampung
...metro stations to serve 24 municipalities. Key figures: Estimated 2 million passengers per day will benefit from the new metro network. 50bn estimated cost...
30+ hari yang lalu dalam JobleadsLaporkan
Beritahukan iklan baru